Konya Selçuklu Sports Facility Pre-Commissioning Flushing Project
Comprehensive pre-commissioning flushing, system cleaning, and protective chemical treatment works were successfully carried out across all heating and cooling systems at the Konya Selçuklu Sports Facility.
Within the scope of the project, 3 chiller units and 500 fan coil units, along with all mechanical piping networks, were thoroughly cleaned. Scale, sediment, and process-related deposits within the system were removed using controlled and approved methods. Following the cleaning procedures, appropriate protective chemicals were introduced to ensure long-term efficiency, operational reliability, and system safety.
All works were planned and executed in accordance with technical standards while maintaining uninterrupted facility operations.