Istanbul Ata Sports Complex Pre-Commissioning Flushing Project
Comprehensive pre-commissioning flushing, cleaning, and protective chemical treatment works were successfully carried out across all heating and cooling systems at the Istanbul Küçükçekmece Ata Sports Complex.
Within the scope of the project, 3 chiller units, 3 hot water boilers, 400 fan coil units, and 28 air handling units were systematically cleaned. Deposits and process-related residues within the system were removed, and appropriate protective chemicals were introduced to ensure long-term efficiency, operational reliability, and system safety.
All procedures were planned and executed in accordance with technical standards and facility requirements, ensuring uninterrupted operational continuity throughout the process.